The walls are coming up. At our last visit, the walls are at 4 foot. If they stay on schedule the first floor should be all blocked in and the columns poured for the 2nd floor, and do i dare say it.. the roof of the first floor poured. When we go back down in another week.
We are about 8 weeks behind schedule, Which means we are right on time for the Mexican time table.
The progress has been slow, but cost wise, It has been cheaper than expected. We are still on the last money sent over in January. Right now the pesos is about 14 to 15 per dollar.
Move photos to follow in 2 weeks..stay tuned.
So what is the latest?
LikeLike
We will have new pictures,in the next week or two. The roof is almost done and we are figuring out how to get 3 sliding doors intact across the border.
LikeLike